Thursday, October 27, 2011

Maintenance Management - 10

Maintenance Management - 10
Question Handling instruction is transportation instructions.
Correct Answer True
Question The supervisor must have good knowledge of his job, he should be able to lead by example.
Correct Answer True
Question Which two departments are closely related to each other?
Correct Answer Production & maintenance
Question Which is considered as main job of a supervisor?
Correct Answer To train subordinate
Question The progress of work inside the plant can be viewed at glance by putting up a ________ in the control room.
Correct Answer Schedule Board
Question On What basis time estimates are calculated for every job while preparing schedules of work in overhauling?
Correct Answer Standard Time
Question The choice of equipment and supplier must be done keeping in mind the ________ in the future.
Correct Answer Maintenance cost
Question Which of the following are the constituents of fire?
Correct Answer Fuel , Heat , Oxygen
Question Following equipment must be tested for correct load bearing capacity :-
Correct Answer Scaffolding , Ladder , Platform
Question Maintenance department evaluation can be done by only one method.
Correct Answer False
Question What is required to bring people together & working in one direction to achieve goals?
Correct Answer Team spirit
Question First aid can be given in following accidents :-
Correct Answer Steam burns , Chemical spilling
Question What is necessary to observe safety precautions in plant particularly relating to worker?
Correct Answer Training (safety)
Question High quality of workmanship helps maintenance people :-
Correct Answer For boosting Morale of Maintenance People , In Identification of efficient
workers , Rewarding Efficient Workers
Question Shelves, Closets such fittings are consider as costing centers for buildings in the assets register.
Correct Answer True
Question Which type of task is a preparation of policy of procurement?
Correct Answer Single contract task
Question Work order release system is the ________ to start the maintenance activity at the correct frequencies.
Correct Answer Trigger

Question Which of the following are diagnostics instrument which are used in maintenance management?
Correct Answer Time Tester , Safety checker for portable electrical tools , Temperature
Sensitive Crayons
Question The efforts are made to reduce time/effort required in carrying out
maintenance work is ________.
Correct Answer Design-in-maintenance
Question It is objective of maintenance to make maximum availability of production plant at :-
Correct Answer Minimum cost
Question Once the budget is prepared then it is necessary to review the same
________.
Correct Answer Time to time
Match The Following
Question -Correct Answer

Time taken -As low as possible

Automation -Decrease break down time
Utilization of machine- As high as possible

Equipment selection- Purchase dept
Multiple Choice Multiple Answer
Question The following costs can be treated under the heads of overhead costs :-
Correct Answer Training and seminar expenses , Traveling expenses , Rent and lease
charges for the space and office area.

Multiple Choice Single Answer
Question Which skill is required to be high where supervision work will be minimal?
Correct Answer Technical skill

Select The Blank
Question In India, most of the industrialist base their decisions to purchase
equipment on the ________.
Correct Answer Price of the equipment

Multiple Choice Single Answer
Question The modern management is composed of evaluation, refinement and
integration of functional objectives into an :-
Correct Answer Integrated corporate goal

Multiple Choice Multiple Answer
Question A Project is defined as :-
Correct Answer Time Bound , A one Time Activity , Restrained by monetary bindings

True/False
Question Expenditure records are prepared by accounts officer.
Correct Answer True

True/False
Question Experience shows that no matter how much money & time is spent on
preventive maintenance, the breakdown do occur.
Correct Answer True

Multiple Choice Multiple Answer
Question Satisfactory performance of maintenance contractor is :-
Correct Answer Quality of work , Skills of manpower , Equipment performance

Multiple Choice Multiple Answer
Question Cost control can be achieved by :-
Correct Answer Establishment of optimum conditions , Measurement of variation from
optimum , Taking corrective action

Multiple Choice Multiple Answer
Question What information is given in spare part list?
Correct Answer Original supplier name , Item number of spare part , Vendor's part name

Select The Blank
Question The wear out portion has ________ failure rates.
Correct Answer Highest

True/False
Question The cost of the ordering can be also substantial in case of large
organizations.
Correct Answer True

Select The Blank
Question In Japan & Western countries equipment discarded after about ________
years.
Correct Answer 7

True/False
Question Most of the ordering costs are fixed in nature.
Correct Answer True

Select The Blank
Question ________ is an invisible, yet important cost.
Correct Answer Stock out cost

Multiple Choice Single Answer
Question The spares required to replace the old worn out spares due to frequent
breakdowns are known as :-
Correct Answer Maintenance spares

Multiple Choice Multiple Answer
Question Following are the part of service installations in the buildings?
Correct Answer Asset register , Technical manuals , Suppliers manuals

Multiple Choice Single Answer
Question The wear-in period which occurs during initial working period, experiences
lot of maintenance problems is also called :-
Correct Answer Teething problems

Multiple Choice Multiple Answer
Question In which of the following process microprocessor can be used?
Correct Answer Fire detection , Theft detection , Energy conservation

Select The Blank
Question The contract service is ________.
Correct Answer Too expensive

Select The Blank
Question The fuel having ________ at slight higher cost can save lot of money.
Correct Answer Better calorific value

True/False
Question The spark generation can be due to sudden breaking of load circuit
causing a fire.
Correct Answer True

True/False
Question Proper communication with related departments can result in increased
cost of spare.
Correct Answer False

Multiple Choice Single Answer
Question The responsibility of maintenance Department is to ensure cost at :-
Correct Answer Minimum

Maintenance Management - 9
True/False
Question Maintenance department evaluation can be done by only one
method.
Correct Answer False

Multiple Choice Multiple Answer
Question What are the content of initial cost?
Correct Answer Taxes , Basic Cost , Installation Charges

Multiple Choice Single Answer
Question Who, due to fear of losing the maintenance contract, may not
reveal enough technical information?
Correct Answer Vendor

True/False
Question Defect analysis gives us information about commonly faced
problems.
Correct Answer True

Select The Blank
Question In India, most of the industrialist base their decisions to purchase
equipment on the ________.
Correct Answer Price of the equipment

Match The Following
Question -Correct Answer

Time taken- As low as possible

Automation Decrease break down
time
0.99

Utilization of machine- As high as possible


Equipment selection -Purchase dept


Multiple Choice Single Answer
Question Which document is called horoscope of that particular equipment
which can tell a lot about it to experienced engineer?
Correct Answer History Card

Multiple Choice Multiple Answer
Question Which of the following are the constituents of fire?
Correct Answer Fuel , Heat , Oxygen

Multiple Choice Multiple Answer
Question Maintenance Control system is used to check following?
Correct Answer Correct starting time of Maintenance activities , Maintenance
planning , To get correct feedback

Multiple Choice Multiple Answer
Question The maintenance department is responsible for :-
Correct Answer Protection of building and plant , Increasing utilization of plant ,
Controlling maintenance cost

Multiple Choice Single Answer
Question Normally Ratio of Unplanned work to planned work is given in :-
Correct Answer Maintenance Report & Analysis

Multiple Choice Single Answer
Question Which type of inspection is to be carried when the machine is
operating?
Correct Answer One-time inspection

True/False
Question Reliability is the probability that product will perform its intended
functions under desired operating conditions over a specified
period of time.
Correct Answer True

Multiple Choice Single Answer
Question The flat part in the bath tub curve is called :-
Correct Answer Normal Life Time

True/False
Question Hazardeous chemicals inventory should be kept at minimum
level
Correct Answer True

Multiple Choice Single Answer
Question Which of the following is process variable which can affect the
equipment?
Correct Answer Flow rate of process fluid

Multiple Choice Multiple Answer
Question Following are the part of service installations in the buildings?
Correct Answer Asset register , Technical manuals , Suppliers manuals

Multiple Choice Single Answer
Question Which analysis gives information about faced problems, and
solution to avoid it?
Correct Answer Defect Analysis

Select The Blank
Question Correct quantity of lubricant assures that lubricant will be used in
optimum quantity and will result in ________.
Correct Answer Economy

Multiple Choice Single Answer
Question The supplier should be competent enough to estimate & provide
means of reducing :-
Correct Answer Down time as minimum as possible

Select The Blank
Question In Japan & Western countries equipment discarded after about
________ years.
Correct Answer 7

Select The Blank
Question The manufacturing time for spare parts can vary from________.
Correct Answer Zero to one year

Multiple Choice Multiple Answer
Question What are the basis on which training programmes are designed?
Correct Answer Needs of Organisation , Type of Organisation , Category of
Pupils
Multiple Choice Multiple Answer
Question Some of the elements of inventory carrying cost are :-
Correct Answer Storage expenses , Insurance charges , Cost of deterioration

Select The Blank
Question ________ should be allowed in case of real emergency.
Correct Answer Contingency purchasing

Multiple Choice Multiple Answer
Question Which are probable period of annual shut Downs in the Year?
Correct Answer Demand for a product is Low , Festival Seasons , Supply of Raw
material is nil.

Select The Blank
Question Reliability can be expressed as probability between________.
Correct Answer 0 to 1

True/False
Question Animal fats can be used as lubricants.
Correct Answer True

Multiple Choice Multiple Answer
Question Master list of all the supplier should consist of information such
as :-
Correct Answer Name, address, telephone, fax nos , Financial status , His rating
for the year.

True/False
Question Indian Standards Institution is Indian body of standardization.
Correct Answer True

True/False
Question Audio cassettes are the part of tools of training.
Correct Answer True

Multiple Choice Single Answer
Question What is necessary to avoid major breakdowns?
Correct Answer Maintenance at right time

Multiple Choice Multiple Answer
Question What type of details are given in Work order?
Correct Answer Specifications , Drawings , Manuals issued

True/False
Question Handling instruction is transportation instructions.
Correct Answer True

Multiple Choice Single Answer
Question What type of task it is to repair & maintenance fire fighting
system?
Correct Answer Repetitive task

True/False
Question Proper communication with related departments can result in
increased cost of spare.
Correct Answer False

Multiple Choice Multiple Answer
Question What type of support equipments are required in Maintenance?
Correct Answer Tools , Spare Parts , Test Equipments

Match The Following
Question -Correct Answer
Grease cups lubrication- Every week
Gear box sumps lubrication-Every six months

Electrical motor bearing lubrication- Every year

Oil nipple lubricated parts lubrication- Every day

Multiple Choice Multiple Answer
Question The performance of maintenance is indicated by :-
Correct Answer Low cost , Low down time , More uptime

Multiple Choice Single Answer
Question Lubrication helps in :-
Correct Answer Increase life of wear and tear parts

Select The Blank
Question Availability of ________ equipment is considered while deciding
maintenance system.
Correct Answer Stand by

select The Blank
Question ________ ratio should be as high as possible.
Correct Answer Planned maintenance work

Select The Blank
Question The correct procedure is applied there is less chance of any
________.
Correct Answer Mistakes

Multiple Choice Single Answer
Question Who is responsible for the design of proper maintenance
system?
Correct Answer Maintenance manger

Select The Blank
Question Spare part lists will be comprehensive for complex equipment
with section wise details along with ________.
Correct Answer Order code numbers

True/False
Question Preventive maintenance program reduces overall maintenance
cost which also include spare cost.
Correct Answer True

Select The Blank
Question The ________ is done to check performance efficiency of a
plant.
Correct Answer Technological Review

Maintenance Management - 8
Select The Blank
Question When a new executive joins the organisation he is usually given________.
Correct Answer Induction training

Select The Blank
Question A unit called ________ measures illumination.
Correct Answer Lux

True/False
Question Value analysis is one way to attempt for quality simplification.
Correct Answer True

True/False
Question A timely corrective action avoids major fault.
Correct Answer True

Multiple Choice Multiple Answer
Question The codification can be done by following methods :-
Correct Answer Mnemonics method , Decimal method , Field method numerical codes

method numerical codes
Multiple Choice Multiple Answer
Question What are the constituents of operating cost?
Correct Answer Cost of Equipment , Cost of Modifications , Cost of Tooling

Multiple Choice Single Answer
Question If equipment creates noise above permissible level then :-
Correct Answer It may produce vibration which may affect other equipment.

Select The Blank
Question According to Lubrication Schedule provision of ________ is given for
maintenance.
Correct Answer Plant Shut Down

Match The Following
Question -Correct Answer
Attention value category -Frequency breakdown equipment

Vital category -Critical equipment

Essential category- Semi critical equipment

Normal category -Non critical equipment
Select The Blank
Question The spark can be generated due to ________ faults.
Correct Answer Phase to phase

Multiple Choice Multiple Answer
Question Satisfactory performance of maintenance contractor is :-
Correct Answer Quality of work , Skills of manpower , Equipment performance

Select The Blank
Question Quality should not be ________ at the cost of lower price.
Correct Answer Sacrificed

Multiple Choice Single Answer
Question How a molecule of fuel fragmented?
Correct Answer H+ and OH

True/False
Question Shelves, Closets such fittings are consider as costing centers for buildings in
the assets register.
Correct Answer True

Multiple Choice Multiple Answer
Question Evaluation of maintenance function can be done by taking following steps :-
Correct Answer Set the achievable targets for maintenance dept for the expected
performance , Check results against set targets , Find out reasons for
variance

Multiple Choice Multiple Answer
Question The energy saving can be achieved by following ways :-
Correct Answer By avoiding excess use , By avoiding wastage , By increasing efficiency of
the equipment
Multiple Choice Single Answer
Question The responsibility of maintenance Department is to ensure cost at :-
Correct Answer Minimum

True/False
Question Demulsibility is separating water from oil when the machine are kept stand
still.
Correct Answer True

Select The Blank
Question There are two types of cost involved with any asset, one is the ________ and
second is initial cost.
Correct Answer Running Cost

Multiple Choice Single Answer
Question It is objective of maintenance to make maximum availability of production
plant at :-
Correct Answer Minimum cost

Multiple Choice Single Answer
Question Which type of maintenance is called to the maintenance work initiated as a
result knowledge of the condition of an item from routine checking?
Correct Answer Condition based maintenance

True/False
Question On line inspection is carried out on machine itself but when it is shut down.
Correct Answer False

Multiple Choice Single Answer
Question In any organization generally called thankless department is :-
Correct Answer Maintenance

Select The Blank
Question Spare part lists will be comprehensive for complex equipment with section
wise details along with ________.
Correct Answer Order code numbers

Select The Blank
Question The progress of work inside the plant can be viewed at glance by putting up a
________ in the control room.
Correct Answer Schedule Board

Select The Blank
Question Reliability can be expressed as probability between________.
Correct Answer 0 to 1

Multiple Choice Single Answer
Question Which analysis gives information about faced problems, and solution to avoid
it?
Correct Answer Defect Analysis

Multiple Choice Multiple Answer
Question In the objective evaluation method, the performance indicators are :-
Correct Answer Overtime ratio , Availability of plant ratio , Spare part ratio

Multiple Choice Multiple Answer
Question The price of the spare part depends on :-
Correct Answer Demand and supply position , Urgency of buyer , Level of negotiations

True/False
Question Computers can be used to predict failures and breakdowns by simulation
method well in advance.
Correct Answer True

True/False
Question The schedule of lubrication of equipment is not a part of maintenance plan.
Correct Answer False

Multiple Choice Single Answer
Question Preventive maintenance :-
Correct Answer Anticipates failures and necessary action

Multiple Choice Multiple Answer
Question Characteristics of spare parts are :-
Correct Answer The requirement of spares increases with the machine getting older. , The
stock out cost is always greater than the cost of spare parts. , There is always
possibility of duplication in the storage.

Multiple Choice Multiple Answer
Question What are the consisitutent of lubricating oil?
Correct Answer Mineral oil , Chemical compounds , Vegetables oils

True/False
Question Maintainability is defined as ease with which product can be serviced or
repaired.
Correct Answer True

True/False
Question Reconditioning is bringing the old used part to its original condition by using
engineering process.
Correct Answer True

Multiple Choice Single Answer
Question It is said that a failure never occurs without :-
Correct Answer Warnings

Multiple Choice Multiple Answer
Question Which utilities require to be planned as a function of maintenance manager?
Correct Answer Electricity , Waste disposal , Steam & gas

Select The Blank
Question The contract service is ________.
Correct Answer Too expensive

Multiple Choice Single Answer
Question One of the desired condition, which is required in a proper coding of the
overheads is :-
Correct Answer The people who operate it should easily remember it.

Multiple Choice Single Answer
Question As the frequency of maintenance is stepped up preventive maintenance cost
Correct Answer Shoots up

Multiple Choice Multiple Answer
Question In the off line inspection, which parameters can be monitored?
Correct Answer Crack detection , Alignment of connecting equipments , Lubricating oils

Multiple Choice Multiple Answer
Question What information is given in a manual of building?
Correct Answer Maintenance of building , Schedule of maintenance , Description of
maintenance

True/False
Question Most of the ordering costs are fixed in nature.
Correct Answer True

Multiple Choice Single Answer
Question Which of the following is one of the causes of fire?
Correct Answer Smoking

Match The Following
Question- Correct Answer
-
Maintenance Record- Recording of Time and Money
Asset Register -List of All Assets of Plant

Maintenance Schedule Instruction on Doing Maintenance Scheduling on rolling basis
Principles of Scheduling Scheduling on rolling basis PERT

Select The Blank
Question ________ should be planned so that workers can approach the equipment
easily.
Correct Answer Gangways

Maintenance Management - 7
True/False
Question Maintenance department evaluation can be done by only one
method.
Correct Answer False

Multiple Choice Multiple Answer
Question What are the content of initial cost?
Correct Answer Taxes , Basic Cost , Installation Charges

Multiple Choice Single Answer
Question Who, due to fear of losing the maintenance contract, may not
reveal enough technical information?
Correct Answer Vendor

True/False
Question Defect analysis gives us information about commonly faced
problems.
Correct Answer True

Select The Blank
Question In India, most of the industrialist base their decisions to purchase
equipment on the ________.
Correct Answer Price of the equipment

Match The Following
Question -Correct Answer

Time taken- As low as possible

Automation Decrease break down
time
0.99

Utilization of machine -As high as possible

Equipment selection- Purchase dept

Multiple Choice Single Answer
Question Which document is called horoscope of that particular equipment
which can tell a lot about it to experienced engineer?
Correct Answer History Card

Multiple Choice Multiple Answer
Question Which of the following are the constituents of fire?
Correct Answer Fuel , Heat , Oxygen

Multiple Choice Multiple Answer
Question Maintenance Control system is used to check following?
Correct Answer Correct starting time of Maintenance activities , Maintenance
planning , To get correct feedback

Multiple Choice Multiple Answer
Question The maintenance department is responsible for :-
Correct Answer Protection of building and plant , Increasing utilization of plant ,
Controlling maintenance cost

Multiple Choice Single Answer
Question Normally Ratio of Unplanned work to planned work is given in :-
Correct Answer Maintenance Report & Analysis

Multiple Choice Single Answer
Question Which type of inspection is to be carried when the machine is
operating?
Correct Answer One-time inspection

True/False
Question Reliability is the probability that product will perform its intended
functions under desired operating conditions over a specified
period of time.
Correct Answer True

Multiple Choice Single Answer
Question The flat part in the bath tub curve is called :-
Correct Answer Normal Life Time

True/False
Question Hazardeous chemicals inventory should be kept at minimum
level
Correct Answer True

Multiple Choice Single Answer
Question Which of the following is process variable which can affect the
equipment?
Correct Answer Flow rate of process fluid

Multiple Choice Multiple Answer
Question Following are the part of service installations in the buildings?
Correct Answer Asset register , Technical manuals , Suppliers manuals

Multiple Choice Single Answer
Question Which analysis gives information about faced problems, and
solution to avoid it?
Correct Answer Defect Analysis

Select The Blank
Question Correct quantity of lubricant assures that lubricant will be used in
optimum quantity and will result in ________.
Correct Answer Economy

Multiple Choice Single Answer
Question The supplier should be competent enough to estimate & provide
means of reducing :-
Correct Answer Down time as minimum as possible

Select The Blank
Question In Japan & Western countries equipment discarded after about
________ years.
Correct Answer 7

Select The Blank
Question The manufacturing time for spare parts can vary from________.
Correct Answer Zero to one year

Multiple Choice Multiple Answer
Question What are the basis on which training programmes are designed?
Correct Answer Needs of Organisation , Type of Organisation , Category of
Pupils

Multiple Choice Multiple Answer
Question Some of the elements of inventory carrying cost are :-
Correct Answer Storage expenses , Insurance charges , Cost of deterioration

Select The Blank
Question ________ should be allowed in case of real emergency.
Correct Answer Contingency purchasing

Multiple Choice Multiple Answer
Question Which are probable period of annual shut Downs in the Year?
Correct Answer Demand for a product is Low , Festival Seasons , Supply of Raw
material is nil.

Select The Blank
Question Reliability can be expressed as probability between________.
Correct Answer 0 to 1

True/False
Question Animal fats can be used as lubricants.
Correct Answer True

Multiple Choice Multiple Answer
Question Master list of all the supplier should consist of information such
as :-
Correct Answer Name, address, telephone, fax nos , Financial status , His rating
for the year.

True/False
Question Indian Standards Institution is Indian body of standardization.
Correct Answer True

True/False
Question Audio cassettes are the part of tools of training.
Correct Answer True

Multiple Choice Single Answer
Question What is necessary to avoid major breakdowns?
Correct Answer Maintenance at right time

Multiple Choice Multiple Answer
Question What type of details are given in Work order?
Correct Answer Specifications , Drawings , Manuals issued

True/False
Question Handling instruction is transportation instructions.
Correct Answer True

Multiple Choice Single Answer
Question What type of task it is to repair & maintenance fire fighting
system?
Correct Answer Repetitive task

True/False
Question Proper communication with related departments can result in
increased cost of spare.
Correct Answer False

Multiple Choice Multiple Answer
Question What type of support equipments are required in Maintenance?
Correct Answer Tools , Spare Parts , Test Equipments

Match The Following
Question -Correct Answer

Grease cups lubrication -Every week

Gear box sumps lubrication -Every six months
Electrical motor bearing lubrication-Every year

Oil nipple lubricated parts lubrication-Every day

Multiple Choice Multiple Answer
Question The performance of maintenance is indicated by :-
Correct Answer Low cost , Low down time , More uptime

Multiple Choice Single Answer
Question Lubrication helps in :-
Correct Answer Increase life of wear and tear parts

Select The Blank
Question Availability of ________ equipment is considered while deciding
maintenance system.
Correct Answer Stand by

Select The Blank
Question ________ ratio should be as high as possible.
Correct Answer Planned maintenance work

Select The Blank
Question The correct procedure is applied there is less chance of any
________.
Correct Answer Mistakes

Multiple Choice Single Answer
Question Who is responsible for the design of proper maintenance
system?
Correct Answer Maintenance manger

Select The Blank
Question Spare part lists will be comprehensive for complex equipment
with section wise details along with ________.
Correct Answer Order code numbers

True/False
Question Preventive maintenance program reduces overall maintenance
cost which also include spare cost.
Correct Answer True

Select The Blank
Question The ________ is done to check performance efficiency of a
plant.
Correct Answer Technological Review

Maintenance Management - 6
Multiple Choice Single Answer
Question
It has been found that after initial period of steam pipe laying is over :-
Correct Answer
The pipeline and various fittings like valve, taps starts leaking.


Multiple Choice Multiple Answer
Question
The objectives of designing for maintainability are :-
Correct Answer
To reduce down time of the product , Rapid fault diagnosis & repair , To reduce damage to equipment & personal.


True/False
Question
Expenditure records are prepared by accounts officer.
Correct Answer
True


True/False
Question
It is said that budgetary process is more a test of implementation skill then anything else.
Correct Answer
False


Multiple Choice Single Answer
Question
During commissioning of the equipment it is necessary to train the staff & workers can be done with help of :-
Correct Answer
Commissioning manuals & equipment supplier technical team.


True/False
Question
The leakage of the steam from pipe can make substantial loss of steam over the year.
Correct Answer
True


True/False
Question
Labor cost is basic cost involved with maintenance work.
Correct Answer
True


Multiple Choice Single Answer
Question
Basic need for improving in maintenance methods requires :-
Correct Answer
To safeguard return on investment with minimum down time


Select The Blank
Question
The ________ is done to check performance efficiency of a plant.
Correct Answer
Technological Review


Select The Blank
Question
________ is part of lubricating planning process.
Correct Answer
Survey


Multiple Choice Single Answer
Question
Water seal condition is one of the :-
Correct Answer
Process variable

Select The Blank
Question
Maintenance department's ________ shows low performance.
Correct Answer
High cost

Select The Blank
Question
A ________ represents basic event which needs no further investigation as sufficient information is available under fault free analysis.
Correct Answer
Circle
Multiple Choice Multiple Answer
Question
What are the different costs involved with maintenance work?
Correct Answer
Labour cost , Material Cost


Multiple Choice Single Answer
Question
Planning and scheduling will increase :-
Correct Answer
Coordination and cooperation


Multiple Choice Single Answer
Question
In any organization generally called thankless department is :-
Correct Answer
Maintenance

Multiple Choice Single Answer
Question
Automation of machines is mainly done for :-
Correct Answer
Detecting the failures and save time

Multiple Choice Multiple Answer
Question
Which of the following are metal working oils?
Correct Answer
Soluble cutting oil , Synthetic cutting oil , Srip grinding oil


Multiple Choice Multiple Answer
Question
What type of support equipments are required in Maintenance?
Correct Answer
Tools , Spare Parts , Test Equipments


Multiple Choice Single Answer
Question
A complete schedule for inspection, overhauling, lubrication is known as :-
Correct Answer
Maintenance Schedule


Multiple Choice Single Answer
Question
Implementing an effective lubrication systems, which will :-
Correct Answer
Reduce down time & part failure


Select The Blank
Question
________ have direct impact on life of equipment.
Correct Answer
User skill


Select The Blank
Question
Work order release system is the ________ to start the maintenance activity at the correct frequencies.
Correct Answer
Trigger


Multiple Choice Single Answer
Question
In India, compared to western countries, maintenance awareness is :-
Correct Answer
Lower


Match The Following
Question
Correct Answer

Product support
Operating assistance to customer

Technical specification
Area & weight of equipment
Operational manual
Commissioning Instruction

Maintenance manual
Fault diagnosis


Multiple Choice Multiple Answer
Question
Spare part can be categorized by :-
Correct Answer
The speed of use , Its value , Its availability


True/False
Question
Calibration is an important function of maintenance manager.
Correct Answer
True

Select The Blank
Question
The spark can be generated due to ________ faults.
Correct Answer
Phase to phase


Multiple Choice Single Answer
Question
The responsibility of maintenance Department is to ensure cost at :-
Correct Answer
Minimum


Multiple Choice Multiple Answer
Question
Which of the following are the constituents of fire?
Correct Answer
Fuel , Heat , Oxygen


Select The Blank
Question
The correct procedure is applied there is less chance of any ________.
Correct Answer
Mistakes


True/False
Question
The operating cost of the equipment is also important factor for the decision making.
Correct Answer
True


Match The Following
Question
Correct Answer

Time taken
As low as possible

Automation
Decrease break down time

Utilization of machine
As high as possible
Equipment selection
Purchase dept

Multiple Choice Single Answer
Question
Which activity is known as great helper for in avoiding unscheduled breakdowns?
Correct Answer
Inspection activity

True/False
Question
Proper communication with related departments can result in increased cost of spare.
Correct Answer
False


Multiple Choice Multiple Answer
Question
Which of the following are diagnostic instruments normally used in maintenance engineering?
Correct Answer
Pocket Thermometer , Ultrasonic Hardness Testing , Static Meter


Select The Blank
Question
________ is carried out when the machine is operating.
Correct Answer
On line inspection


True/False
Question
To prepare training aids, technical manual to be used.
Correct Answer
True


Multiple Choice Single Answer
Question
What is necessary to observe safety precautions in plant particularly relating to worker?
Correct Answer
Training (safety)


Multiple Choice Multiple Answer
Question
What may be the result of too many levels of authority?
Correct Answer
Overlapping of duties , Confusion , No work done


Multiple Choice Multiple Answer
Question
Which of the following are asphyxiants?
Correct Answer
Carbon mono oxide , Hydrogen sulphide , Hydrogen cyanide


True/False
Question
Down time is time taken to failure after started using.
Correct Answer
False


Select The Blank
Question
Availability of plant ratio is ________.
Correct Answer
Total running hours / total available hours.


Multiple Choice Single Answer
Question
Besides basic functions maintenance department also performs some management functions, one of them is :-
Correct Answer
Value engineering & standardization of spares and procedures.


Multiple Choice Multiple Answer
Question
Satisfactory performance of maintenance contractor is :-
Correct Answer
Quality of work , Skills of manpower , Equipment performance


Multiple Choice Multiple Answer
Question
The price of the spare part depends on :-
Correct Answer
Demand and supply position , Urgency of buyer , Level of negotiations


True/False
Question
Value = cost / function.
Correct Answer False

No comments:

Post a Comment